chore(release): bump workspace version to 0.4.1; canary base to 0.5.0
The [workspace.package] version (inherited by every crate via version.workspace) lagged at 0.3.0 through the 0.4.0 release — bump it to 0.4.1, the release being cut, and refresh the 8 workspace entries in Cargo.lock to match (CI builds --locked). Also advance the CI canary-base fallbacks (deb/rpm/flatpak/android/release workflows + build-rpm.sh) from 0.3.0 to 0.5.0 so main/canary builds sort one minor ahead of the latest stable line, per the documented channel convention. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
This commit is contained in:
@@ -80,7 +80,7 @@ jobs:
|
||||
run: |
|
||||
case "$GITHUB_REF" in
|
||||
refs/tags/v*) VN="${GITHUB_REF_NAME#v}"; TRACK="alpha" ;; # alpha = built-in closed testing
|
||||
*) VN="0.3.0-ci${GITHUB_RUN_NUMBER}"; TRACK="internal" ;;
|
||||
*) VN="0.5.0-ci${GITHUB_RUN_NUMBER}"; TRACK="internal" ;;
|
||||
esac
|
||||
echo "VERSION_NAME=$VN" >> "$GITHUB_ENV"
|
||||
echo "PLAY_TRACK=$TRACK" >> "$GITHUB_ENV"
|
||||
|
||||
Reference in New Issue
Block a user